Working Group Meeting
Date: 27/05/2025
Participants: Natalie Muric, Paul Donohoe
Model editor: Andreea Passare
Note editor: Achilles Dougalis
Discussion
-
The “Offer” folder in the Conceptual Model file was moved to the sandbox folder because an Offer module is not foreseen due to the fact that epo:Offer is implemented in the ePO-core module.
#793 was discussed: As seen in the picture below, eForms have a section tagged as “ProcurementProject”
-
The eForms mappings map the information on the ProcurementProject as an
epo:Procedurewhich is not correct. There should be a new concept in ePO representing the ProcurementProject accounting for the following fields:-
Title
-
Description
-
Internal Identifier
-
Estimated Value
-
classification code
-
purpose
-
-
Class
epo:PlannedProcurementwas created as a subclass ofepo:ProcurementElement. It was also made sure that the attributes onepo:ProcurementElementcover the needs ofepo:PlannedProcurement. -
Concepts
epo:hasLegalBasisandepo:hasLegalBasisDescriptionwere moved fromepo:ProcurementObjecttoepo:ProcurementElement. -
There is a problem with LocalLegalBasis in the mappings.An eform does not have a locallegalBasis, although it used to be in epo:Notice as a standard form requirement.
-
A a new concept called
epo:LocalLegalBasisInformationwas created, with the following attributes and Object properties:-
dct:description : rdf:PlainLiteral [1..1] -
epo:concernsProcurementElement : epo:ProcurementElement [1] -
`epo:hasLegalBasis : at-voc:legal-basis [0..1]
-