Working Group meeting

Date: 07/11/2024  
Participants: Natalie Muric
Model editor: Andreea Pasăre
Note editor: Grzegorz Kostkowski

Agenda

  • Work on eForms mapping issues. Discussions
    The WG worked on the following GitHub tickets:

#663

It was confirmed that class instances included in the CM are not exported in model2owl. The WG consulted with the model2owl maintainers to verify this information. It was also confirmed that the workflow documentation includes the confirmed information. The ticket was closed with the following comment:

TLctUrPDubQAAAAASUVORK5CYII=

#706

The following three diagrams were changed:

award decision diagram

YeZQa7ATU5IAAAAASUVORK5CYII=

dynamic purchasing system diagram

YeZQa7ATU5IAAAAASUVORK5CYII=

framework agreement diagram:

YeZQa7ATU5IAAAAASUVORK5CYII=

Due to the significant impact of the changes, their release has been postponed from version 4.2.0 to 5.0.0.

#677

The WG analyzed the business terms mentioned in the ticket description and concluded that no modifications are required. The findings were documented in the comment and the ticket was closed:

sHQRKXwAAAABJRU5ErkJggg==

#678

The WG proposed to replace the epo:hasEstimatedDuration association with epo:definesEstimatedContractDuration originating from epo:ContractTerm. The former association is unused in mappings and thus can be safely removed. This was verified by inspecting selected packages in the ted-rdf-mapping repository.

A+2u6O3Gc2KCAAAAAElFTkSuQmCC

Action Points

  • Update the Guide to the ePO Conceptual Model to include information that class instances are not exported in model2owl artefacts. The instances are represented in EA UML diagram as blue boxes:

Hxbv52u9JHo5AAAAAElFTkSuQmCC